The externally funded projects that were carried out by the Department of Electrical and Computer Engineering are listed in the following table according to the starting year.
Year 2008
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. Saleh Al-A. Al-Hinai
|
Renewable Energy Business Opportunities in Oman
|
Daewoo Shipbuilding & Marine Engineering Co.- Korea
|
|
Dr. Al-Hinai
|
Power System Study for two Additional Solar Turbines in Safah Field
|
Occidental of Oman, Inc
|
|
Dr. Al-Hinai
|
Stray Current Study: Reality Check & Saih Rawl Depletion Compression Project Harmonic Study Implementation Stage
|
PDO
|
|
Dr. A. Al-Badi
|
Losses Reduction in Abnormally and Normally Loaded Distribution Transformer
|
Mazoon Electricity Company
|
|
Dr. A. Gastli
|
Stray Current Study: Reality Check & Implementation Stage
|
PDO
|
Year 2007
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. A. Al-Hinai
|
Power system study for Occidental of Oman power network
|
Occidental of Oman, Inc
|
|
Dr. A. Al-Hinai
|
Electrical Energy Saving Study for Sultan Qaboos University Hospital
|
SQU Hospital
|
|
Dr. A. Gastli
|
Stray Current Study: Reality Check & Implementation Stage
|
PDO
|
Year 2005
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. K. Ellithy
|
Transient Stability Study for New Generators at Mukhaizna, Qarn Alam, Yibal, Saih Rawi and Harweel.
|
PDO
|
Year 2004
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. K. Ellithy
|
QA ESP Surface Electrical Equipment.
|
PDO
|
|
Dr. I. Metwally
|
A Study to Eliminate 33kV and 132kV Wooden Pole Fires.
|
PDO
|
|
Dr. I. Metwally
|
Stray-Current Corrosion Study of PDO's Well Casings and ESP Assemblies.
|
PDO
|
|
Dr. M. Meribout
|
Design and Implementation of a new Non-Radioactive Remote Oil Tank Monitoring System.
|
PDO
|
|
Dr. K. Ellithy
|
Harmonics Study.
|
PDO
|
Year 2003
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. K. Ellithy
|
Transient Stability Study for New Power Stations at Nimr & Yibal
|
PDO
|
|
Dr. M. Habli
|
Development of a BS&W Measuring Device
|
PDO
|
|
Dr. A. Al-Badi
|
Mitigation of AC Induced Voltage on Pipeline Located Close to Power Line
|
PDO
|
Year 2002
|
Principle Investigator
|
Project Title
|
Funded by
|
|
Dr. K. Ellithy
|
Harmonics Measurement and Analysis for PDO Electrical Distribution Networks
|
PDO
|
|
Dr. M. Habli
|
Development of an Intelligent Multi-Sensor Multi-Phase Flow Meter
|
PDO
|
|
Dr. M. Habli
|
Development of an Oil/Water Level Measurement Device
|
PDO
|
|
Dr. A. Gastli
|
Failure Identification and Analysis of PDO HV Motors
|
PDO
|